Central House

Full life-safety refit across an eight-storey office tower in central Manchester, phased over twelve weekends with no impact to weekday tenancy.

Start a project
central house
The brief

A live multi-tenant tower,
refitted floor by floor.

Central House sits on a 24/7 occupancy contract, there was never a window where the building could be emptied. The brief was to upgrade the dated conventional fire alarm to a fully addressable L2 system without ever leaving a tenant unprotected.

We planned the work as a rolling overlap: temporary detection covering one floor while the permanent install happened on the next. Every cause-and-effect was rebuilt from the existing as-built drawings and reverified with the building manager before each floor went live.

Quick Overview

L2 addressable detection

Replaced 1980s conventional panel with a multi-loop addressable system across 8 floors.

Rolling floor handover

Temporary protection on every floor until the permanent system was commissioned.

Emergency lighting upgrade

Self-test fittings on every escape route with central monitoring.

Cause-and-effect rebuild

Full reverification with the building manager before each floor cutover.

On site

The work,
in detail.

A small selection from the as-built record.

Watch

Project walkthrough.

Services used

Three of our disciplines, one site.

Fire Alarm System Installation, Design & Commissioning

Addressable and conventional fire alarm design, installation and certification.

Open service

Emergency Lighting Installation, Testing & Maintenance

Self-test and central-battery emergency lighting installation, testing and certification.

Open service

Full Life Safety Monitoring

Networked detection, interface units and graphics-panel monitoring across estates.

Open service

Twelve weekends, zero complaints from tenants. That tells you everything about how they ran the site.

- Building Manager, Central House
More work

Other recent projects.

A couple more case studies along similar lines.

sherborne mrf

Sherborne MRF Sprinkler Upgrade

Replacement of zone-check systems and upgraded pump controls across a 12,000 m² material recovery facility, completed in two phased weekend shutdowns.

View project
ley and wheeler

Ley & Wheeler Warehouse & Distribution

Self-regulating trace heating installation for sprinkler tanks and pipework in a −25 °C cold storage facility.

View project
canning town

Canning Town

Self-test emergency lighting retrofit across six floors, including monthly compliance reporting.

View project

Got a project in mind?